What permits does an ADU need in Dallas?
Dallas does not allow an ADU by right in most cases; obtain zoning authorization through an applicable ADU overlay or Board of Adjustment special exception before building permits.
Permit guides
Search the published guide library. Check the conditions, confirm the jurisdiction, then follow the official application path.
Dallas does not allow an ADU by right in most cases; obtain zoning authorization through an applicable ADU overlay or Board of Adjustment special exception before building permits.
Dallas requires a permit for a residential panel or service upgrade and requires licensed electrical work unless the homeowner qualifies through the City's knowledge review.
Dallas requires a fence permit above four feet in a front yard or above six feet elsewhere, and requires a permit for a swimming-pool barrier.
Dallas generally requires a permit for residential mechanical equipment replacement or alteration, with licensed-contractor or qualifying homestead-owner rules.
Dallas requires a reroof permit unless a single-family or duplex reroof fits the City's narrow published exemption for work valued at no more than $500.
Dallas routes residential solar and photovoltaic work through DallasNow with a dedicated checklist and building and electrical inspections.
Dallas generally requires a plumbing permit for water-heater replacement; its leak-repair exemption does not cover replacement or rearrangement of valves, pipes or fixtures.