What permit does an ADU need in San Diego?
Every San Diego ADU or JADU requires a building permit, with zoning, coastal, utility, energy, fire and trade requirements determined by the site and project type.
Permit guides
Search the published guide library. Check the conditions, confirm the jurisdiction, then follow the official application path.
Every San Diego ADU or JADU requires a building permit, with zoning, coastal, utility, energy, fire and trade requirements determined by the site and project type.
A residential panel, breaker or service upgrade requires an electrical permit; qualifying breaker work from 15 through 400 amps can use San Diego's Simple MEP path.
A fence up to seven feet tall is generally exempt from a building permit in San Diego, but height, location, zoning and structural conditions still apply.
Installed HVAC replacement requires a mechanical permit in San Diego; qualifying residential equipment can use the Simple No-Plan combination permit.
A like-for-like roof-covering renewal can be permit-exempt, but San Diego requires a permit when the work changes structural framing, sheathing, supports, lateral elements or foundations.
Residential rooftop solar requires a San Diego permit; qualifying systems at 38.4 kW AC or less can be self-issued without plan review when every published condition is met.
A standard residential water-heater replacement requires a permit and normally uses San Diego's Simple No-Plan combination permit; tankless and plan-required scopes follow a different path.